Wood stock…
With Alan’s help in a couple of hours we cut and split all these logs (the new log splitter being a great success). We wouldn’t fare very well with this … Read More
Restoring a 200 year old French Farmhouse – Year 15 of ?
With Alan’s help in a couple of hours we cut and split all these logs (the new log splitter being a great success). We wouldn’t fare very well with this … Read More
The overall game plan for the terrace and around the pool is to get the areas ready for concreting. This means installing all the drainage, electrics etc and raising to … Read More
With the high temperatures during the summer we get regular impressive storms. Tried to capture the lightning on my camera but by the time I figured out the correct exposure the … Read More
We paid two visits to the market and BBQ at Segur this year and it continues to be a great evening out. For some reason it always threatens to rain … Read More
The major work item this summer was to get the area around the pool ready for concreting (next year?) and then tiling (year after?). This involved leveling one area that … Read More
Along with the major works around the pool a couple of other groundworks were completed. The infilling behind one of the walls was completed up to the level of the … Read More
After the poor weather at Easter we decided to fit a pool heater to allow us to use the pool anytime between April and October. The heater is a ‘heat … Read More
All the work on the pond seems to be paying off as on this visit the water is very clear allowing you to see all the leaves and debris on … Read More