Kitchen upgrades..
The only plan for the kitchen this week (I thought) was a lick of paint and new pelmets above the windows…. so after the tumble drier was ordered (haven’t paid … Read More
Restoring a 200 year old French Farmhouse – Year 15 of ?
The only plan for the kitchen this week (I thought) was a lick of paint and new pelmets above the windows…. so after the tumble drier was ordered (haven’t paid … Read More
Have not updated the site for the last few days as the pace has slowed down somewhat, perhaps directly related to the increase in temperature, the warmer it is the … Read More
At the risk of boring everyone not much is happening except for work on the landing. Although work was interupted by having to go and chop firewood (chainsaw playtime….) and … Read More
Another day another new wall. The landing continues to take shape after the construction of the wall and door (to what will be the master bedroom) under the A-frame. … Read More
So another day and some progress although the morning was taken up with a late start and then off to the builders merchants for more materials (we also stopped to … Read More
Today we started framing out the landing, which is really more of a room than a landing! It will house the study complete with bookshelves and desk. It will also … Read More
With the temperature above 20 degrees C today the pool is looking better and better! There was one problem identified though, the builders have damaged the top … Read More
With many thanks to Barbara and Tony we can see that the pool now really looks like a pool! The pool … Read More
Thanks to our kind Dutch Neighbour Ben we have another picture of the pool construction:
With thanks to our friends Tony and Barbara we can show what progress is being made on the pool! The company doing the basic construction had told me that the … Read More