2019 Master Suite – part 1a
The time has come to start work on the master suite – a large bedroom and en-suite in the attic. This is going to cause a problem as it has … Read More
Restoring a 200 year old French Farmhouse – Year 15 of ?
The time has come to start work on the master suite – a large bedroom and en-suite in the attic. This is going to cause a problem as it has … Read More
Its been almost 5 years since I updated the blog! My only excuse is that work has been all consuming (along with some family events) that have distracted me from … Read More
Life is very busy so updating the website has take a backseat. Jobs done — Rebuild front terrace and slab – 2011/2 Concrete terrace and around Pool – 2011/2 … Read More
A whole year has passed since I last posted on the blog! This has been a very quiet 12 months from the French farmhouse perspective, with only around three and … Read More
From a ‘work’ perspective 2010 is drawing to a close and what a good year it has been. Being able to spend around 12 weeks in France has allowed us … Read More
Our loir ‘count’ has reduced over the last few years and having only caught one last year we thought we had fixed the problem. However ‘loir cam’ spotted activity in … Read More
The (old) front door was the last door/window to be replaced in the house. The height was around 5′ 10″ so anyone over that (and that includes me) was liable … Read More
After Ben recovered from flu we started on the door: the old doors and glass were quickly removed: The old oak uprights were then removed and the first few layers … Read More
Ben unfortunately had Flu for a few days so work on the new front door was delayed but this allowed me to get on with an internal project – removing … Read More
It is always good to start with a ‘before’ picture…. we had collected the new doors and windows from Lapeyre in Brive and decided the order of play was new … Read More