Downstairs Bathroom – Part 3
After the opening for the window was made the sides were rebuilt with a slight curve and the oak window sill installed. This gives a much nicer appearance than just having straight sides:
The tiling was started with the shower completed first:
Then the long job of pointing the walls, both inside and out:
Once completed (nearly 3 days!) the window was installed to complete the job:
We are very pleased with the result:
The rest of the tiling was then started with the floor, and the areas behind the toilet and sink:
Grouting was completed and the toilet, shower and sink installed:
There is still work to be finished off with painting, skirting and trim to be fitted, but this won’t take long on our next visit.
The outside looks great as well, we just need to finish off the rest of the wall:
With extra work for the window we ran out of time, as we do every year, so other projects didn’t get completed. But we now have two very good bathrooms and this has been progress indeed.
While the end may not be quite in sight we do feel that we have at least climbed the summit and are on our way to finishing.