Groundworks

Along with the major works around the pool a couple of other groundworks were completed. The infilling behind one of the walls was completed up to the level of the exisiting grass. The next phase will be to get some topsoil and raise the height of the grass to make the lawn flat(er).

 The other job was to build a concrete base to form an area for the wood splitter. Over time this will have a small roof to allow work in the rain!