A Wall Story – Part 7

The two tons of gravel arrived this morning and was quickly moved to backfill the wall, the geotextile fabric was then laid over the top and then another level of gravel put on top ready for the next stage…..

 

 

The next stage (in the future but before next summer) is now to level the ground between the house and the wall. This shows in profile the slope of the ground. About 200mm needs to come off by the house and be moved to wall side and then we should have flat area ready for a terrace!